MIKRON INDUSTRIES

Owner: Mikron Industries
Engineers: Trnka Engineers Co.
Completion: February 1999

Charter completed extensive structural modifications to Mikron’s existing manufacturing facility with a compressed schedule and difficult site conditions. The project included shoring the existing tilt-up walls with 24-foot-deep sheet piling, as well as shoring the existing roof truss system in the 8,000 SF work area. Charter also removed the existing slab, excavated more than 10 feet deep, and built a very complex system of cast-in-place concrete foundations, ascending and descending troughs, and machine bases and hold-downs.

With new manufacturing equipment soon to be delivered, Mikron required that Charter complete this challenging job far ahead of the original schedule. In addition, Charter was required to keep a very clean site so as not to interrupt the operation of a critical manufacturing line adjacent to the project location. The project called for innovative techniques, continuous attention to processes and fast and accurate execution of all phases of construction.

©2005 CHARTER CONSTRUCTION.   Main Office: 206.382.1900   Oregon Office: 503.546.2600   |   Terms of Use   |   Privacy Policy   |