Construction Defect Repair Projects

Sort By Name End Date
Arbor Station Building Envelope Rehabilitation
Arbor Station is a community of townhomes located in Beaverton, OR. The complex consists of 60 residential buildings and a community building.
Active
Gold Pointe Condominiums
Sitting on a hill overlooking the Narrows Bridge, Gold Pointe Condominiums gets its fair share of high winds and rain.
Active
Market Court Condominiums
The windows and stucco cladding system is failing at this Belltown condominium building in Seattle.
Active
Seward Park Condominiums
Seward Park Condominiums is a 6 building, 37 unit gated community in Seattle, WA. Problems include heavy water intrusion at windows and doors due to defects in the original construction.
Active
Site 17 Condominiums
The 130 unit complex will undergo a strip and reclad of siding and installation of new windows, roofs and decks.
Active
Stonewater
Charter Construction has been hired to perform the remediation at Stonewater, a 344 unit complex in Hillsboro, OR. With 99 buildings, this will be the largest construction defect repair project ever completed in Oregon.
Active
Tapteal Apartments
The remediation project at the 98-unit apartment complex in Richland, WA will be split into two phases.
Active
The Heights at Issaquah Ridge Townhomes
Charter Construction has been heavily involved with the Owners Association for the past 5 years from the initial investigations to providing litigation estimates for its lawsuit, performing temporary repairs and most recently, providing value engineering options during the negotiation process.
Active
Park Place Condominiums
This 39 unit, mixed use condominium building in Bellevue, WA was renovated to correct a failing EIFS cladding system.
11/2011
Regata Condominiums
Regata Condominiums, a 103 unit, mixed use complex located in Seattle, underwent an envelope remediation as a result of improper construction that led to significant water damage.
09/2011

Pages